The first floor walls begin with the two vertical elements at left which are structural steel firmly bolted to the concrete foundation



The steel provides added strength on the wind-exposed site.



Otherwise, it's mostly regular wood frame 2x6 construction common in the United States.



Pretty nice location for a job site.



Constructing the wall while it lays flat on the floor.



It is always impressive to see what these two men can do with their hands and minds - with the help of a power saw and nail-gun, too.